Project data

  • For the opening ceremony of the European Games on 21.06.2019 in Minsk, eight TUBE projection screens were installed with SCENE - a Gerriets front projection screen also optimised for this application.
  • The TUBE systems were installed on an eight-sided construction in the centre of the Dinamo Arena in Minsk, which reopened in 2018. The octahedral stage construction was used both as a playing surface for the orchestra and to display large-scale projections.
  • 44 customised flight cases were stackable and manufactured in standard pallet dimensions for cost-efficient transport. This meant that the total of nine (8+1) TUBE systems, consisting of 25 carbon tubes in different lengths as well as nine drives and controls, could be transported quickly and safely.